Acton Industrial Park – London
At Unit 36, Acton Industrial Park in West London, our team delivered a comprehensive internal partitioning package using a combination of the JPS30FS and JPS60FS Jumbo Partition Systems. The project formed part of a refurbishment and fit-out programme creating new office areas, meeting rooms, workshops and specialist laboratory spaces within the industrial building.
The solution required a mixture of fire-rated partitions to meet the varying fire compartmentation requirements across the building, while maintaining a consistent architectural finish.
Working alongside the main contractor, our team installed a series of jumbo stud partitions extending from floor level to the underside of the soffit to create multiple internal spaces throughout the unit. The layout included workshop areas, mechanical plant rooms, meeting rooms and office accommodation, each requiring different fire ratings depending on their use.
To achieve this, a combination of JPS30FS and JPS60FS systems was utilised, allowing the project team to provide the appropriate fire resistance performance for each area while maintaining structural robustness and efficient installation.
Additional Works: Fire-rated ceiling deck installations and perimeter walls
The internal layout required multiple wall types to achieve the fire strategy for the building. The JPS60FS system was used where higher levels of fire protection were required, such as laboratory and plant areas, while the JPS30FS system provided fire separation for corridors, offices and supporting spaces.
Key elements of the installation included:
The flexible nature of the JPS system allowed multiple fire ratings to be incorporated within a single project while maintaining a consistent appearance throughout the building.
The completed installation successfully transformed the industrial unit into a fully compartmentalised operational facility, providing safe fire separation between workshop, office and laboratory spaces.
By combining the JPS30FS and JPS60FS Jumbo Partition Systems, the project delivered a cost-effective and structurally robust partitioning solution capable of meeting the building’s fire safety strategy while supporting a modern workspace environment.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |