Brighton Trade Park – Retail Unit Separation
At Brighton Trade Park on Crowhurst Road, our team delivered a high-performance internal fire partition to separate two adjoining industrial retail units. The project required a large-scale one-hour fire-rated wall capable of spanning the internal warehouse space while maintaining strong acoustic performance and structural stability.
The installation formed the dividing wall between Units 2A and 2B, creating two independent operational spaces within the existing trade park building.
The project required the design and installation of a full-height jumbo stud partition wall extending from existing blockwork up to the underside of the roof structure. The wall was constructed using a robust steel stud system designed to provide 60 minutes fire resistance and high acoustic separation, ensuring compliance with fire safety regulations and landlord requirements.
The finished partition provided a durable internal boundary suitable for industrial and warehouse environments while maintaining a clean architectural appearance.
Programme: Approximately 2–3 weeks installation
The system was engineered to provide high structural performance within the large-span warehouse environment.
Key construction elements included:
Powered access equipment was used to safely construct the partition at height while maintaining efficient installation across the warehouse floor.
The completed installation provides a robust, fire-rated sub-division wall that effectively separates the two trade units while maintaining the fire strategy of the building.
The JPS60FS Jumbo Partition System delivered a strong, reliable solution capable of achieving 60 minutes fire resistance and 54dB acoustic performance, while the smooth finished surfaces provide a clean, professional appearance suitable for industrial and commercial environments.
This project demonstrates the ability of the JPS Jumbo Partition System to deliver large-scale fire compartmentation within warehouse and trade park developments, ensuring compliance, durability and efficient installation.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |