Jumbo Partition Systems (JPS) delivered a large-scale acoustic partition installation at the Scottish Exhibition & Conference Centre (SECC), Exhibition Hall 4, Glasgow. The project required the creation of a substantial temporary partition to divide the exhibition hall while maintaining strict acoustic performance and structural requirements.
The partition was designed to span the full height of the building structure, reaching the underside of the roof beams to ensure complete acoustic separation between event spaces.
By installing a high-performance JPS acoustic jumbo partition system, the space could be effectively separated for multiple simultaneous events without sound transfer between areas.
Location: SECC Exhibition Hall 4, Glasgow
Client / Contractor: GES (Global Experience Specialists)
System Installed: JPS Acoustic Jumbo Partition System
Wall Length: 82 metres
Wall Height: Approximately 15 metres to underside of roof structure
Acoustic Performance: Up to 54dB acoustic rating
Fire Rating: Up to 60 minutes
Finish: Close jointed finish with painted surface
Exhibition halls present unique construction challenges due to their extreme height, large spans, and complex roof structures. In this case, the partition needed to:
To achieve the required acoustic separation, the wall had to be fully sealed to the underside of the roof structure with no air gaps, ensuring optimal sound insulation performance.
Jumbo Partition Systems supplied and installed a JPS F60S acoustic jumbo partition system, designed specifically for high-performance sound separation in large venues.
The wall construction included:
The resulting system delivered a 54dB acoustic rating with 60-minute fire resistance, making it suitable for demanding exhibition and event environments.
The completed installation successfully created a large acoustic separation wall within SECC Hall 4, enabling the venue to host multiple events simultaneously without sound interference.
The flexibility and scale of the JPS Jumbo Partition System allowed the exhibition space to be quickly reconfigured while maintaining the high acoustic and safety standards required for international events and exhibitions.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |