Halesfield 20 New Industrial Units | JPS60FS Fire Rated Acoustic Partition Systems | Jumbo Stud Partitions

About this project

Halesfield 20 Industrial Warehouses, Telford

JPS Jumbo Partition Systems delivered a large-scale warehouse subdivision project at Halesfield 20, Telford (TF7 4QU). The project involved the installation of multiple high-performance internal dividing walls across several industrial buildings to create flexible, lettable warehouse units while meeting fire and acoustic performance requirements.

Using the JPS60FS Jumbo Partition System, the installation provided a robust and compliant solution designed specifically for high-bay industrial environments. The partitions were engineered to deliver fire resistance, acoustic separation, and structural durability suitable for long-term commercial use.

Project Overview

  • Project: Industrial Warehouse Subdivision
  • Location: Halesfield 20, Telford, TF7 4QU
  • Client: DWilson Property Holding Group Ltd
  • System Used: JPS60FS Jumbo Partition System
  • Partition Height: Up to 8 metres to underside of portal rafters
  • Finish: Smooth / Painted Smooth finish options

Scope: Multiple high-bay warehouse dividing partitions across several buildings

Scope of Works

The development consisted of multiple industrial warehouse buildings, each subdivided using the JPS jumbo partition system to create separate commercial units.

Across the site, numerous internal partition walls were installed including:

  • Building 1: Walls A, B and C
  • Building 2: Walls D through J
  • Building 3: Walls K through Q

These partitions created a series of independent warehouse units within the larger buildings, allowing the developer to maximise flexibility for future tenants.

Due to the scale of the buildings and the height of the structures, specialist installation methods and powered access equipment were used to safely construct the partitions.

System Performance

The JPS60FS Jumbo Partition System was selected for its proven performance in industrial environments where durability, fire protection, and acoustic separation are essential.

Key system characteristics:

  • Fire Resistance: 60 minutes
  • Acoustic Rating: Up to 54 dB
  • Maximum Partition Height: Up to 8 metres
  • Robustness Rating: Extreme duty performance
  • Stud Construction: Heavy gauge steel studs installed at 600mm centres
  • Boarding: High-performance robust boards both sides
  • Insulation: 75mm mineral wool acoustic insulation
  • Overall Partition Width: Approximately 178mm

These specifications provide high levels of safety, durability, and sound separation between units.

Challenges & Solutions

Large Multi-Building Development

The project required coordination across three separate industrial buildings, each requiring multiple partitions installed in sequence while other construction works progressed.

High-Bay Installation

Partitions were constructed up to 8 metres high, requiring specialist access equipment and experienced installers to ensure structural accuracy and safe installation.

Future Tenant Flexibility

The use of the JPS Jumbo Partition System allowed the developer to create flexible warehouse units that can accommodate a wide range of future occupiers.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 9
JUMBO STUD WALL Built for the London Olympic Games 2012 - 1
JUMBO STUD WALL Built for the London Olympic Games 2012 - 2
JUMBO STUD WALL Built for the London Olympic Games 2012 - 4
Installed Commissioned And Certified By Jumbo Stud Partition Systems

Project Outcome

The completed installation successfully delivered a series of robust, fire-rated warehouse divisions, enabling the buildings at Halesfield 20 to operate as multiple independent commercial units.

By combining high fire resistance, strong acoustic performance, and durable construction, the JPS60FS Jumbo Partition System provided an efficient and reliable solution for large-scale industrial unit subdivision.

Why JPS60FS?

The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.

Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.

This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.

🏗️ Discover more Jumbo Stud Wall Partitioning Projects

Speak to the Experts

If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.

📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements