Case Study

ExCeL London – London 2012 Olympic Games

Temporary Acoustic & Fire-Rated Partition Solution

Boxing & Fencing Arenas

JUMBO STUD WALL Built for the London Olympic Games 2012 - 9

Project Overview

For the London 2012 Olympic Games, ExCeL London required a temporary, high-performance acoustic partition to separate the Boxing and Fencing competition areas within a vast exhibition hall environment.

Jumbo Stud Partitions was appointed to design, supply and install a robust, fire-rated partition system capable of delivering outstanding acoustic performance — without any permanent impact on the building fabric.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 2

Client

GES – Global Experience Specialists

Location

ExCeL London, Royal Docks

The Challenge

  • Create a temporary acoustic dividing wall to separate live Olympic sporting events

  • Achieve high acoustic performance in a large, open venue

  • Deliver fire resistance and severe-duty robustness

  • No fixings permitted into floors, walls or the building structure

  • Complete installation within a tight Olympic build programme

ExCeL London stipulated that no holes or permanent fixings could be made to the building — requiring a fully engineered, non-intrusive solution.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 1

The Solution

Jumbo Stud Partitions designed and installed a bespoke F60S Robust Partition System, engineered specifically for the constraints of the venue.

A custom head-track fixing method was developed, allowing the partition to connect to existing in-situ sliding gear at high level — delivering full structural integrity without penetrating the building fabric.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 4

Key Project Facts

  • Partition Type: F60S Smooth Finish (painted white)

  • Length: 87 metres

  • Height: Up to 10 metres

  • Fire Rating: 60 minutes

  • Acoustic Performance: 54 dB

  • Robustness: Severe Duty Rated

  • Build Programme: 7 days maximum

  • Completed On Site: 6 days

JUMBO STUD WALL Built for the London Olympic Games 2012 - 7

Performance & Results

  • Installed one day ahead of programme

  • Delivered excellent sound separation between Olympic events

  • Achieved fire safety compliance in a critical public venue

  • Maintained a clean, professional arena finish

  • Fully dismantled post-Games with no trace of construction

The partition was removed quickly and efficiently after the Games, leaving the venue exactly as found.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 4
JUMBO STUD WALL Built for the London Olympic Games 2012 - 6

Outcome

This project demonstrates Jumbo Stud Partitions’ ability to:

  • Deliver complex, high-risk temporary structures

  • Engineer non-invasive partition solutions

  • Perform under extreme time and performance pressure

  • Operate successfully within world-class venues and events

JUMBO STUD WALL Built for the London Olympic Games 2012 - 4
JUMBO STUD WALL Built for the London Olympic Games 2012 - 6

Why Jumbo Stud Partitions

✔ Specialist acoustic & fire-rated partitions
✔ Engineered solutions for complex environments
✔ Temporary and permanent systems
✔ Proven performance on landmark projects

JPS “AC” Acoustic Partition Systems

Speak to the Experts

If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.

📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements

4. Southampton Hampshire Warehouse Division

One hour fire rated division of commercial unit utilising 250m2 of PS60FS Jumbo Stud Partition System at 8.9 metres high, painted white with two coats of Johnston’s vinyl matt emulsion paint
WPS60