Integra ME Industrial Units – Maidstone, Kent
To support fire compartmentation requirements within a modern industrial development, our team delivered a high-performance internal fire partition using the JPS60CP Composite Panel Partition System. The installation provided a robust 60-minute fire-rated separation between units while maintaining a clean, durable industrial finish suitable for a busy logistics environment.
The project formed part of the development at Units F1–F3 and G, Integra ME, Bircholt Road, Maidstone, Kent, where internal divisions were required to separate warehouse and operational spaces in compliance with fire safety regulations.
The solution utilised JPS60CP composite stone wool core panels, installed vertically to form a continuous fire-rated partition. These panels provide both fire integrity and insulation performance while offering a smooth, pre-finished steel face that eliminates the need for secondary finishing.
The wall was integrated with existing structural elements including steel columns and adjacent blockwork construction, ensuring a continuous fire-rated barrier across the full separation line. The installation also incorporated specialist head restraint details and fire batt sealing around structural steel to maintain the required fire performance.
Finish: Smooth polyester coated steel faces in White
The partition system was designed to integrate efficiently with the building structure while maintaining fire performance across all junctions.
Key installation elements included:
The lightweight composite system allowed rapid installation while delivering the required fire resistance and long-term durability in a warehouse environment.
The completed JPS60CP partition provides a high-performance fire separation that supports the safe operation of multiple industrial units within the development. The smooth steel finish also delivers a practical and low-maintenance surface suited to the demands of warehouse and logistics facilities.
By combining fire protection, speed of installation, and cost efficiency, the JPS60CP Composite Panel Partition System proved an ideal solution for this large-scale industrial project.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |