Hambridge Road Industrial Estate – Newbury, Berkshire
At Units D, E and F, Hambridge Road Industrial Estate in Newbury, our team delivered a large-scale internal partitioning installation using the JPS60FS Jumbo Partition System. The project involved the construction of multiple full-height fire-rated compartment walls within an industrial warehouse environment, creating safe and functional internal divisions across the facility.
The installation formed part of a wider internal reconfiguration of the industrial units, including the creation of workshops, storage areas and supporting operational spaces.
The primary scope of works centred around the installation of two large 60-minute fire-rated jumbo partition walls, designed to provide effective fire compartmentation between the industrial units.
Each wall measured approximately 35.2 metres in length, extending from 6.4 metres at eaves height, rising to 8.4 metres at the roof apex before stepping down to approximately 6.9 metres at the office section of the building.
These large-scale partitions created robust fire separation across the building while maintaining the flexibility required within the operational warehouse layout.
Finish: Industrial finish suitable for warehouse environments.
The partitions were constructed using a heavy-duty jumbo stud steel framework, designed specifically for high industrial environments requiring both strength and fire performance.
Key construction elements included:
Powered access equipment was utilised during installation due to the significant wall heights and warehouse environment.
The completed installation delivered high-performance fire compartmentation across the industrial units, enabling safe separation between operational areas while maintaining structural robustness suitable for a busy warehouse environment.
The
Jumbo Partition System provided the ideal solution for the project, combining large-span capability, certified fire protection and efficient installation.
This project demonstrates how jumbo stud partition systems can be effectively used to create large-scale fire-rated separations within industrial buildings, supporting both operational flexibility and regulatory compliance.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |