Case Study: JPS60FS Jumbo Partition System

Power Park Training Centre – Nottingham

For the development of a new training centre at Unit 3A, Power Park, our team delivered a large-scale internal partitioning solution using the JPS60FS Jumbo Partition System. The installation created robust internal divisions within a high-bay industrial environment while delivering strong acoustic performance and fire-rated protection.

The project required tall internal partitions capable of spanning significant heights within the warehouse structure while integrating with the building’s steel portal frame.

Project Overview

The partitions were designed as full-height jumbo walls, forming two primary internal separations referred to as Wall A and Wall B within the facility layout. The system was engineered to reach heights of up to 11 metres, allowing the partition to run from floor level to the underside of the portal rafter beams.

The design incorporated specialist deflection head details to accommodate structural movement from wind and roof loading, ensuring the partition remains stable and compliant with fire and structural requirements.

Key Project Details

  • Project: Power Park Training Centre
  • Location: Unit 3A, Power Park, Nottingham
  • Client: Oakwhite Contracts Ltd
  • Partition System: JPS60FS Jumbo Partition System
  • Fire Rating: 30 Minutes Fire Resistance (Integrity & Insulation)
  • Acoustic Performance: 43dB
  • Maximum Height: 11 metres
  • Wall Lengths:
    • Wall A – approx. 33 metres long
    • Wall B – approx. 25 metres long
  • System Construction: Steel stud jumbo partition with performance boards

Overall Partition Width: Approximately 228mm

Installation Approach

Due to the scale of the structure, the system utilised a heavy-duty steel stud framework installed at 600mm centres, combined with high-performance fire-rated boards on both faces.

The installation included:

  • Deep deflection head channels designed to accommodate up to 80mm structural movement
  • Robust steel stud framing for extreme durability
  • Door openings constructed using composite lintels to support the partition above
  • Specialist encasement of structural columns to maintain fire integrity
  • Smooth finished surfaces ready for decoration

These elements allowed the system to deliver both structural resilience and high acoustic performance, making it suitable for training spaces within the facility.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 9
JUMBO STUD WALL Built for the London Olympic Games 2012 - 1
JUMBO STUD WALL Built for the London Olympic Games 2012 - 2
JUMBO STUD WALL Built for the London Olympic Games 2012 - 4
Installed Commissioned And Certified By Jumbo Stud Partition Systems

Project Outcome

The completed installation delivered a high-performance internal partition system capable of spanning extreme heights while maintaining fire safety and acoustic separation. The smooth finish provides a clean architectural appearance suitable for modern commercial interiors.

The JPS60FS Jumbo Partition System proved an ideal solution for this project, combining strength, speed of installation, and compliance with fire and acoustic requirements within a large-scale industrial training facility.

Why JPS60FS?

The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.

Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.

This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.

🏗️ Discover more Jumbo Stud Wall Partitioning Projects

Speak to the Experts

If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.

📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements