Here East – Queen Elizabeth Olympic Park, Hackney, London
At the iconic Here East campus within the Queen Elizabeth Olympic Park, our team delivered a high-performance internal fire partition using the JPS60FS Jumbo Partition System. The installation formed a large-scale internal separation within Studio 7 at the International Broadcast Centre (IBC), originally developed for the London 2012 Olympic Games and now one of London’s leading technology and innovation hubs.
The project required a tall, high-bay partition capable of spanning large industrial spaces while maintaining robust fire and acoustic performance.
The JPS60FS system was selected to provide a 60-minute fire-rated partition with strong acoustic separation, ensuring safe compartmentation within the building while supporting flexible studio and workspace layouts.
The partition was designed as a large-format jumbo wall running approximately 39 metres in length and up to 10 metres high, creating a substantial internal division across the studio space.
Due to the building’s long-span roof structure, the partition also incorporated a specialist deflection head system, allowing for 45mm movement both upwards and downwards, ensuring structural tolerance while maintaining fire integrity.
Finish: Smooth painted finish to both sides
The system was engineered to suit the scale and structural conditions of the existing Olympic broadcast facility.
Key installation elements included:
The continuous steel framing system ensured exceptional structural stability, particularly important within the large-span roof environment of the former Olympic broadcast facility.
The completed installation provides a large-scale fire compartment wall capable of spanning extreme heights within a major commercial building. The system delivers the required fire protection while maintaining excellent acoustic separation between studio and operational spaces.
The JPS60FS Jumbo Partition System proved ideally suited to the project, combining structural strength, fire performance, and acoustic control within one of London’s most recognisable post-Olympic developments.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |