Wellington Retail Park

About this project

Case Study: JPS60FS Jumbo Partition System

Unit 8 Wellington Retail Park – Waterlooville

At Wellington Retail Park in Waterlooville, our team delivered a large-scale internal sub-division wall using the JPS60FS Jumbo Partition System. The project formed part of a landlord refurbishment programme to divide a former single retail unit into two separate retail spaces, ready for future tenant occupation.

Working within an occupied retail park environment, the installation required careful coordination to maintain site safety, minimise disruption to neighbouring stores and ensure compliance with strict fire and acoustic performance requirements.

Project Overview

Jumbo Stud Partitions Ltd were appointed to design, supply and install a full-height fire-rated partition wall forming the new boundary between Units 8A and 8B. The system chosen was the JPS60FS 54dB Robust Acoustic Jumbo Partition System, providing both 60 minutes fire resistance and high acoustic separation to meet landlord and building control requirements.

The wall was constructed as a full-height jumbo stud partition extending to the underside of the warehouse roof structure, delivering reliable compartmentation within the large retail unit.

Key Project Details

  • Project: Retail Unit Sub-Division
  • Location: Unit 8, Wellington Retail Park, Waterlooville
  • Client: British Land
  • Main Contractor: West1
  • Partition System: JPS60FS Jumbo Partition System
  • Fire Rating: 60 minutes (Integrity & Insulation)
  • Acoustic Rating: 54dB
  • Maximum Wall Height: Approximately 10 metres
  • Finish: Smooth mist coat finish ready for decoration
  • Programme: 4 weeks

Completion: 2026

Installation Approach

The partition system was engineered to provide structural strength, fire performance and acoustic control within the large-span retail environment.

Key construction elements included:

  • 150mm steel section studs installed at 600mm centres
  • 75mm mineral wool insulation (45kg/m³) within the wall cavity
  • 12.5mm JPS robust performance boards installed to both faces
  • Deep head channel detail allowing structural deflection of 20mm upward and 85mm downward
  • Overall partition width of approximately 175mm providing enhanced acoustic and fire performance.

Access plant and careful sequencing were required to install the wall beneath the pitched warehouse roof structure while maintaining safe operations within the retail park.

Key Challenges

  • Operational Retail Park: Surrounding retail units remained open throughout the programme, requiring strict logistics planning and controlled deliveries.
  • Full-Height Construction: The partition extended to the underside of the roof structure, requiring powered access and coordination with structural elements.

Fire & Acoustic Compliance: The system needed to achieve 60-minute fire protection alongside 54dB acoustic separation to satisfy landlord and regulatory requirements.

JUMBO STUD WALL Built for the London Olympic Games 2012 - 9
JUMBO STUD WALL Built for the London Olympic Games 2012 - 1
JUMBO STUD WALL Built for the London Olympic Games 2012 - 2
JUMBO STUD WALL Built for the London Olympic Games 2012 - 4
Installed Commissioned And Certified By Jumbo Stud Partition Systems

Project Outcome

The completed installation successfully transformed the original retail unit into two independent, compliant retail spaces, ready for landlord handover and tenant fit-out.

The JPS60FS Jumbo Partition System delivered a high-performance solution combining fire resistance, acoustic control and structural durability. The smooth finished surfaces also ensured the wall was suitable for shell-condition handover, allowing future tenants to complete their internal fit-outs with ease.

This project demonstrates how the JPS60FS system can efficiently deliver large-scale, fire-rated compartmentation within retail and industrial environments while maintaining programme certainty and regulatory compliance.

Why JPS60FS?

The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.

Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.

This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.

🏗️ Discover more Jumbo Stud Wall Partitioning Projects

Speak to the Experts

If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.

📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements