Unit 8 Wellington Retail Park – Waterlooville
At Wellington Retail Park in Waterlooville, our team delivered a large-scale internal sub-division wall using the JPS60FS Jumbo Partition System. The project formed part of a landlord refurbishment programme to divide a former single retail unit into two separate retail spaces, ready for future tenant occupation.
Working within an occupied retail park environment, the installation required careful coordination to maintain site safety, minimise disruption to neighbouring stores and ensure compliance with strict fire and acoustic performance requirements.
Jumbo Stud Partitions Ltd were appointed to design, supply and install a full-height fire-rated partition wall forming the new boundary between Units 8A and 8B. The system chosen was the JPS60FS 54dB Robust Acoustic Jumbo Partition System, providing both 60 minutes fire resistance and high acoustic separation to meet landlord and building control requirements.
The wall was constructed as a full-height jumbo stud partition extending to the underside of the warehouse roof structure, delivering reliable compartmentation within the large retail unit.
Completion: 2026
The partition system was engineered to provide structural strength, fire performance and acoustic control within the large-span retail environment.
Key construction elements included:
Access plant and careful sequencing were required to install the wall beneath the pitched warehouse roof structure while maintaining safe operations within the retail park.
Fire & Acoustic Compliance: The system needed to achieve 60-minute fire protection alongside 54dB acoustic separation to satisfy landlord and regulatory requirements.
The completed installation successfully transformed the original retail unit into two independent, compliant retail spaces, ready for landlord handover and tenant fit-out.
The JPS60FS Jumbo Partition System delivered a high-performance solution combining fire resistance, acoustic control and structural durability. The smooth finished surfaces also ensured the wall was suitable for shell-condition handover, allowing future tenants to complete their internal fit-outs with ease.
This project demonstrates how the JPS60FS system can efficiently deliver large-scale, fire-rated compartmentation within retail and industrial environments while maintaining programme certainty and regulatory compliance.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |