Queen Elizabeth Distribution Park – West Thurrock, Essex
At Unit E, Queen Elizabeth Distribution Park in West Thurrock, our team delivered a large-scale internal warehouse division using the JPS60FS Jumbo Partition System. The installation was carried out as part of a warehouse reconfiguration project, creating a secure and fire-compliant separation within the distribution facility occupied by Breezemount UK Ltd.
Located within one of the South East’s key logistics hubs, the building features high-bay warehouse accommodation with approximately 12 metre eaves height, requiring a partition system capable of spanning significant heights while maintaining structural integrity and fire performance.
The project required the construction of a full-height fire-rated warehouse partition dividing a large logistics facility into operational zones. The installed wall measured approximately 80.5 metres in length and extended from the warehouse floor up to the underside of the roof structure, reaching approximately 12.8 metres at eaves and up to 15 metres at its highest point.
The partition was designed to deliver one-hour fire resistance together with strong acoustic separation, ensuring safe compartmentation within the warehouse environment while supporting the operational requirements of the distribution centre.
Programme: Approximately 3 weeks installation
Due to the scale of the warehouse space, the partition was engineered using a heavy-duty jumbo stud construction capable of supporting significant wall heights.
Key construction features included:
Powered access equipment was used to safely construct the partition at height within the large-span distribution building.
The completed installation delivered a robust, large-scale fire compartment wall capable of performing within a demanding logistics environment. The partition successfully provides fire separation, acoustic performance and structural durability while protecting the wall from operational impacts.
The JPS60FS Jumbo Partition System proved ideally suited for this project, delivering a high-performance internal division within a major distribution warehouse while maintaining efficient installation across the large floorplate.
This project demonstrates how jumbo partition systems can provide cost-effective, fire-rated separation within modern distribution and logistics facilities.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |