JPS Jumbo Partition Systems were selected to deliver extensive internal partitioning works at the MacDermid Graphic Solutions facility in Wigan. The project involved the installation of multiple high-bay industrial partitions to create operational separation within the production building while maintaining fire safety and acoustic performance.
Working within a live industrial environment, the project required careful coordination to ensure the new partitions integrated with the existing building structure and services without disrupting operations.
Finish: smooth painted finish option selected
The installation included a series of large internal partition walls constructed throughout the building to create separated working areas and improve operational functionality.
The works incorporated several major partition walls across the facility, including:
These partitions were strategically positioned to divide production areas while maintaining safe fire compartmentation within the building.
The JPS Jumbo Partition System was selected due to its ability to deliver robust industrial separation while maintaining high fire and acoustic performance.
This specification ensures the partitions remain stable, durable, and compliant with fire and acoustic performance requirements in demanding industrial environments.
Working Around Existing Steelwork
The building structure included numerous RSJ columns and roof purlins, requiring precise detailing to ensure the partitions could be installed while maintaining structural movement allowances.
High-Level Construction
With partition heights approaching 9 metres, specialist installation techniques and powered access equipment were required to safely complete the works.
Live Industrial Environment
Installation works were coordinated to minimise disruption to the operational areas of the facility.
The completed partitions successfully created clearly defined operational zones within the MacDermid facility while maintaining fire safety and acoustic separation between areas.
The project demonstrates how JPS Jumbo Partition Systems provide a reliable solution for large-scale industrial partitioning, particularly where tall walls, robust construction, and high fire performance are required.
The JPS60FS system is engineered for commercial and industrial environments where certified fire protection, acoustic performance, and efficient installation are essential. Designed as a robust steel-framed partition solution, it delivers 60-minute fire resistance while maintaining structural integrity and a high-quality finish.
Its precision-engineered build-up offers a practical, programme-friendly alternative to traditional blockwork, reducing weight, installation time, and on-site disruption without compromising compliance or durability.
This project highlights Jumbo Stud Partitions’ ability to deliver reliable, fire-rated partition systems that combine performance, efficiency, and build certainty — even within high-profile, time-sensitive environments.
If you’re planning a project that demands jumbo stud partition solutions, fire-rated acoustic performance, or extreme heights, we’re ready to help.
📞 Call: 01425 472748
🌐 www.jumbostudpartitions.co.uk
📧 Contact us to discuss your requirements
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |